Mission

– Ensure the good design of the material of the piping network both at technical and cost level
– Issue technical part of inquiries, bid analysis and order for piping components
– Interface with other Piping specialists, project specialists and designers
– Refer to project piping and layout lead and to head of piping material section
– The Engineer executes the activities within his area of responsibility, ensuring the compliance with the QA/QC and HSE requirements

Duties and Responsibilities

A-Development Technology know how and Commercial support
B-Feasibility
C-Bidding phase / Commercial proposal development

– Select critical material
– Estimate cost

D-Project Execution

– Be responsible for the quality, respect of budget and respect of project schedule for piping material tasks
– Review the Client technical documentation and requirements
– Be responsible for the design of all piping components
– Issue project piping material specification and piping components data sheets
– Perform wall thickness calculations of pipes
-Issue technical specification for requisition of all piping components
– Issue technical bid evaluation for piping components offers
– Review and approve vendors documents
– Maintain project technical files and update Company standards
– Perform the inter-disciplines checking for the part of documents in accordance with the scope of piping material section
– Check documents issued by piping material engineers
– Check the issued MTO validate by lead
– Be responsible for the establishment of the PMMS (Piping Material Management System) data base
– Assist inspection department
– Prepare mechanical valve specification for body of motorized valves
– Inform on a permanent basis the Project Piping and Layout leader of any foreseen technical or financial or delay risk
– Issue the part of the REX in accordance with the scope of piping material section after contract completion
– Evaluate Piping Material cost

E-Construction and start up

– Pro vide technical support
– Assist, when necessary, engineering adjustment on site

F-Home office activities (master)

– Validate cost estimate
– Projects coordination: provide input to discipline leads ad material engineer to harmonize design and methodologies
– Provide support to projects and procurements to solve non standards and standard problems
– Define the modification of department work flow and dept. technical standards
– Participate to the modification of company work flow and technical standardisation
– Collect project feed backs for continuous improvement implementation (Lesson Learned)
– Participate to vendor and outsourcing qualification
– Participate to project/company procurement strategy (Purchasing team)
– Develop and scout tools for simplified design activities
– Plan, control and manage outsourcing engineering center

Requirement

– Minimum 10 years of experience in Oil & Gas Industry and/or the same field.

Other Details

Location: Doha Office, Qatar
Duration: 1 year (extendable)
Working Schedule: 9 hours a day x 5 days a week
Starting Date: ASAP (preferred Candidates currently in Qatar)

Upload your CV/resume or any other relevant file. Max. file size: 128 MB. MS Word or Adobe PDF files only.

%d bloggers like this: